ADU Pre Construction Services From Design to Permits and Engineering
From floor plans to stamped drawings and full permit management, we take your ADU from concept to city-approved plans without delays or stress.
From floor plans to stamped drawings and full permit management, we take your ADU from concept to city-approved plans without delays or stress.
Most ADU delays, surprise costs, and failed permits happen before construction even starts. A strong pre-construction phase removes the guesswork and gives you a clear, build-ready plan.
Build-ready plans eliminate backtracking, change orders, and wasted weeks.
Before construction ever begins, strong pre-construction work protects your time, budget, and peace of mind. IMKAT handles every detail up front so you never face surprise redesigns, delays, or unexpected fees later.
Each part of the pre-construction phase has its own role. Explore our design, engineering, and permitting services to understand how we prepare your ADU for approval and construction.
Floor plans, layouts, elevations, and 3D visuals tailored to your property and lifestyle.
Structural calculations, framing plans, Title 24 energy reports, and build-ready engineering documents.
We submit your ADU plans to the city, manage corrections, and handle all communication until approval.
ADUs offer several advantages:
ADUs can share utilities with the main home or have separate meters. Some cities require separate sewer and water connections. Our ADU consultants will assess your electrical panel to determine if it can support your ADU or if an upgrade is needed.
Our costs range from $125,000 to $300,000+, depending on size, location, and materials. Garage conversions are typically the cheapest, while detached ADUs are the most expensive.
View some of our models and consult with our ADU specialists for pricing.
Our pricing does not include utilities and permits, as they vary by property.
Permits are required for construction, zoning, and utilities. The permit process takes 3-5 months and varies by city. California law requires cities to approve or deny ADU applications within 60 days.