Professional ADU Design and Floor Plans in Sacramento
From floor plans and elevations our in-house team designs smart, code-compliant ADU layouts built for comfort, efficiency, and California approval.
From floor plans and elevations our in-house team designs smart, code-compliant ADU layouts built for comfort, efficiency, and California approval.
Design is the foundation of your entire ADU project. The quality of your layout, elevations, and planning directly affects your construction cost, city approval timeline, interior comfort, and long-term usability. When the design phase is done right, everything that follows becomes easier, faster, and more predictable.
Good design prevents expensive change orders later.
Clear elevations, accurate dimensions, and code-aligned plans reduce corrections.
Layouts and floorplans eliminate guesswork.
Smart layouts make even small ADUs feel open and functional.
Strong design ensures structural work is accurate and efficient.
We handle every technical detail up front so your ADU is approved faster, built smoother, and delivered without the surprises most homeowners experience.
Clear upfront design + engineering costs with no surprise add-ons.
Dive deeper into each part of the pre-construction phase. Whether you’re starting with sketches or need full engineering and permit handling, IMKAT has a dedicated service for every step.
Structural calculations, framing plans, Title 24 energy reports, and build-ready engineering documents.
We submit your ADU plans to the city, manage corrections, and handle all communication until approval.
ADUs offer several advantages:
ADUs can share utilities with the main home or have separate meters. Some cities require separate sewer and water connections. Our ADU consultants will assess your electrical panel to determine if it can support your ADU or if an upgrade is needed.
Our costs range from $125,000 to $300,000+, depending on size, location, and materials. Garage conversions are typically the cheapest, while detached ADUs are the most expensive.
View some of our models and consult with our ADU specialists for pricing.
Our pricing does not include utilities and permits, as they vary by property.
Permits are required for construction, zoning, and utilities. The permit process takes 3-5 months and varies by city. California law requires cities to approve or deny ADU applications within 60 days.