Complete ADU Engineering Plans for Permits and Construction
Our certified engineers create detailed structural and energy-compliant plans to ensure your ADU is safe, efficient, and permit-ready.
Our certified engineers create detailed structural and energy-compliant plans to ensure your ADU is safe, efficient, and permit-ready.
Behind every safe, durable, and city-approved ADU is precise engineering. This stage protects your investment, prevents costly issues, and keeps your project moving smoothly through city approvals.
California requires ADUs to withstand earthquakes and heavy structural loads engineering ensures your ADU is built to those standards.
Cities approve complete, engineering-accurate plans faster because everything aligns with building codes from day one.
Engineered plans match Sacramento and California ADU regulations, reducing the risk of rejections, redesigns, and costly corrections.
Strong engineering eliminates guesswork on site — avoiding delays, structural issues, or unexpected costs once building begins.
Engineering is more than calculations it determines how smoothly your ADU gets approved, how much it costs to build, and how safely it stands for decades. With IMKAT, you get precise engineering that prevents delays and keeps your project on track.
Engineering is just one part of a successful ADU. Continue your journey with the IMKAT team that handles every phase — from design to permits.
We submit your ADU plans to the city, manage corrections, and handle all communication until approval.
Floor plans, layouts, elevations, and 3D visuals tailored to your property and lifestyle.
ADUs offer several advantages:
ADUs can share utilities with the main home or have separate meters. Some cities require separate sewer and water connections. Our ADU consultants will assess your electrical panel to determine if it can support your ADU or if an upgrade is needed.
Our costs range from $125,000 to $300,000+, depending on size, location, and materials. Garage conversions are typically the cheapest, while detached ADUs are the most expensive.
View some of our models and consult with our ADU specialists for pricing.
Our pricing does not include utilities and permits, as they vary by property.
Permits are required for construction, zoning, and utilities. The permit process takes 3-5 months and varies by city. California law requires cities to approve or deny ADU applications within 60 days.