ADU Permitting Services in California

ADU Permitting Services From Submission to Approval

Permitting is the most time-consuming part of any ADU project — but it doesn’t have to be. Our team prepares complete plan sets, submits everything to your local city, manages revisions, and handles all communication until your permit is fully approved and ready for construction.

200+ ADU permits submitted across California
Experienced with Sacramento & Bay Area cities
Complete plan check management — start to finish
Fast, accurate documentation that avoids delays
Why Permitting Is Critical

Permits Decide Whether Your ADU
Moves Forward or Gets Delayed

ADU permitting is more than paperwork — it’s a required approval that determines how long your project takes, how much it costs, and whether construction can even begin. Cities have strict zoning rules, documentation standards, and plan check requirements. One missing detail can cause weeks or months of delays. IMKAT ensures every plan, form, and correction is handled properly the first time.

Avoid Costly Plan Check Delays

Incorrect or incomplete submissions can add months to your ADU timeline.

Ensure Full Code Compliance

We meet California building codes, Title 24, fire separation, setbacks, and all city requirements.

Faster Approval With Correct Documentation

Accurate plans and engineering reduce revisions and prevent permit rejections.

Stress-Free Communication With the City

We handle all emails, calls, comments, and updates so you don’t have to.

WHAT’S INCLUDED

Complete ADU Permitting,
Managed for You From Start to Approval

We take care of the entire permitting process — preparing documents, submitting to the city, responding to corrections, and securing final approval. You get a smooth, guided experience with no guesswork and no back-and-forth with the city.

  • Structural Engineering

    Beams, loads, shear walls, seismic safety—everything your ADU needs to stand strong.

  • Load Calculations

    Precise calculations required for Title 24, foundation sizing, and city approval.

  • Foundation & Framing Plans

    Complete details for slabs, footings, framing layouts, and roof structures.

  • Shear Wall & Structural Diagrams

    Code-accurate engineering that protects your ADU during earthquakes and heavy loads.

  • Title 24 Energy Reports

    State-required energy compliance prepared by certified specialists.

  •  Build-Ready Engineering Plan Set 

    A full set of city-ready documents stamped and prepared for permit submission.

Your ADU starts with complete, build-ready plans designed, engineered, and permitted by one team.

Start Your ADU With Accurate, City-Approved Plans
Why Good Engineering Matters

Engineering That Saves
You Time, Money, and Headaches

Engineering is more than calculations it determines how smoothly your ADU gets approved, how much it costs to build, and how safely it stands for decades. With IMKAT, you get precise engineering that prevents delays and keeps your project on track.

Future-Proof Your Lifestyle

Build a flexible space that adapts with your family’s changing needs.

EXPLORE PRE-CONSTRUCTION SERVICES

Everything Your ADU Engineering
Needs Done In-House

Engineering is just one part of a successful ADU. Continue your journey with the IMKAT team that handles every phase — from design to permits.

ADU Permitting

We submit your ADU plans to the city, manage corrections, and handle all communication until approval.

ADU Design

Floor plans, layouts, elevations, and 3D visuals tailored to your property and lifestyle.

Get Engineer-Stamped ADU Plans Ready for City Approval

Avoid delays, mistakes, and rejected plans. Let our engineering team prepare a complete, permit-ready plan set tailored to your property.

Free consultation & on-site assessment
Licensed & insured Sacramento ADU builder
Flexible financing available

Frequently Asked
Questions About ADUs

Everything you need to know about building, pricing, and designing your backyard ADU with IMKAT. Whether you’re just starting or ready to build these answers cover it all.

Talk to an ADU Expert

What are the benefits of building an ADU?

ADUs offer several advantages:

  • Affordable Housing: They provide an affordable housing option without the need for purchasing additional land or major new infrastructure.
  • Additional Income: Homeowners can generate rental income by leasing the ADU.
  • Family Flexibility: ADUs allow extended families to live close together while maintaining privacy.
  • Efficient Use of Space: They make use of underutilized spaces, enhancing property value and utility.

Do ADUs require separate utility connections?

ADUs can share utilities with the main home or have separate meters. Some cities require separate sewer and water connections. Our ADU consultants will assess your electrical panel to determine if it can support your ADU or if an upgrade is needed.

How much does it cost to build an ADU in California?

Our costs range from $125,000 to $300,000+, depending on size, location, and materials. Garage conversions are typically the cheapest, while detached ADUs are the most expensive.

View some of our models and consult with our ADU specialists for pricing. 

Our pricing does not include utilities and permits, as they vary by property.

What permits are required for an ADU in California?

Permits are required for construction, zoning, and utilities. The permit process takes 3-5 months and varies by city. California law requires cities to approve or deny ADU applications within 60 days.